Institute for Sustainability and
Innovation in Structural Engineering
MENU

Cluster EE

/
/
/
Cluster EE

Extreme Events

Overview

Cluster EE

  • Robustness of structures for exceptional and unidentified load.
  • Characterization of materials and systems under extreme actions: elevated temperature and elevated strain rates.
  • Structural fire design of steel and composite structures, from material characterization to building behaviour.
  • Performance based-design of steel and composite structures against extreme events, using CFD and FEM.
  • Fire resistance and resilience of sustainable cities against extreme events.
  • Digitalization in fire safety design and management, using BIM and SIG.
  • Optimization, innovative and intelligent decarbonized fire protection systems for steel and composite structures.
  • Ecological Nano Fire-Resistant High Strength lightweight Concrete.
  • Protective Systems and materials: innovative technologies to mitigate blast effects on structures.

People

Cluster Coordinator
No data was found
Aldina Maria da Cruz Santiago
Alejandro Cruz Escobar
Ana Francisca Henriques Parente dos Santos
André Barbosa
Damjan Cekerevac
Daniel Alexandre Simões Oliveira

Projects

Name: D_INNOCFSCONC
ID: 512
Project IR: Helder David da Silva Craveiro
Start Date: 10/03/2022
End Date: 09/02/2023
Institution: UC
Group: SMCT
Cluster: EE
Funding entity: P2020
Status: APPROVED
Name: FAILNOMORE
ID: 58
Project IR: Aldina Maria da Cruz Santiago
Start Date: 07/01/2020
End Date: 06/30/2022
Institution: UC
Group: SMCT
Cluster: EE
Funding entity: EU
Status: FINISHED
Name: FreedamPlus
ID: 60
Project IR: Aldina Maria da Cruz Santiago
Start Date: 07/01/2020
End Date: 12/31/2022
Institution: UC
Group: SMCT
Cluster: EE
Funding entity: EU
Status: FINISHED
Name: CONNECT
ID: 513
Project IR: Helder David da Silva Craveiro
Start Date: 01/02/2023
End Date: 01/01/2024
Institution: UC
Group: SMCT
Cluster: EE
Funding entity: Outros PT
Status: APPROVED
Name: Switch2Steel
ID: 161
Project IR: Aldina Maria da Cruz Santiago
Start Date: 01/01/2021
End Date: 06/30/2023
Institution: UC
Group: SMCT
Cluster: EE
Funding entity: P2020
Status: FINISHED
Name: Tyre4BuildInsul
ID: 365
Project IR: Paulo Fernando Antunes dos Santos
Start Date: 07/26/2018
End Date: 07/25/2022
Institution: UC
Group: FP
Cluster: EE
Funding entity: FCT
Status: FINISHED

Latest News